Our team of energy specialists are focusses on delivering energy and cost savings on the ground and not just on paper. We work very closely with our clients to understand nuances of the site, and also to ensure that our energy conservation schemes are understood by the engineering teams. We believe this is critical for the project's success as the site team has a key role to play during implementation and maintenance of the energy saving projects.
We also coach teams on energy saving best practices to ensure that the energy and cost benefits are realised for years to come. The following case studies are illustrations to show you how we engage with the client through the entire process, and how we make impact happen on the ground. This approach is a unique proposition of UVKS, and a big reason for clients continuing to work with us.
1. Grand Hyatt Bombay
Chiller plant and auxillaries
Saving: Rs 151 Lakhs per annum
Investment: Rs 191 Lakhs
Payback: < 2 years
Boiler and hot water systems
Saving: Rs 10 Lakhs per annum
Investment: Rs 11 Lakhs
Payback: < 1 year
Pumps and pumping systems
Electrical systems
Saving: Rs 42 Lakhs per annum
Investment: Rs 18 Lakhs
Payback: < 1 year
Saving: Rs 48 Lakhs per annum
Investment: Rs 90 Lakhs
Payback: 2 years
Some ECMs from the project
-
Interlink secondary water pumps and operate only 3 pumps during non-peak period
-
Install energy efficient 250TR energy efficient chiller to operate during peak load along with 800TR chiller
-
Modify pumping system to exploit available energy and thereby stopping overhead tank pump
-
Install occupancy lighting sensors in select locations




2. Vivanta by Taj, Kovalam
Chiller plant and auxillaries
Saving: Rs 27 Lakhs per annum
Investment: Rs 39 Lakhs
Payback: < 1.5 years
Boiler and hot water systems
Saving: Rs 22 Lakhs per annum
Investment: Rs 20 Lakhs
Payback: < 1 year
Pumps and pumping systems
Saving: Rs 3.8 Lakhs per annum
Investment: Rs 8.4 Lakhs
Payback: ~2 years
Lighting
Saving: Rs 9.2 Lakhs per annum
Investment: Rs 14.3 Lakhs
Payback: ~ 1.5 years
Some ECMs from the project
-
Replace chiller condenser pump with optimal capacity energy efficient pump
-
Replace hot water boilers with energy efficiency heat pump for hot water generation and useful chilled water concurrently